3.
Installation Base:The soil texture should be firm and solid.
4.
During installation, keep the pump axile in horizontal p ition.
5.The end of
water inlet pipe should be immersed under water in about one meter and far away
from the end of mud in about half meter.
6.After installing the pump,calculate the
suitable suction height and head.Under the stable water level condition,
水工及其它方面
机组进水流道设计不合理或与机组不配套、水泵淹没深度不当,宁夏混流泵销售,以及机组启动和停机顺序不合理等,都会使进水条件恶化,排污混流泵销售,产生漩涡,诱发汽蚀或加重机组及泵房振动。采用破坏虹吸真空断流的机组在启动时,若驼峰段空气挟带困难,形成虹吸时间过长;拍门断流的机组拍门设计不合理,时开时闭,不断撞击拍门座;支撑水泵和电机的基础发生不均匀沉陷或基础的刚性较差等原因,也都会导致机组发生振动。
注意功率是否突然增大或降低,工业混流泵销售,流量扬程是否突然减少,如有应停车检查。
Pay more attention
to know if the power suddenly increases or reduces,球铁混流泵销售, if the flow and head are
suddenly lessen, if it is, pls stop to check.
3、经常注意检查各部分螺丝是否因振动而松动,如松动应随时上紧。
Check all parts
screws if they are loose, tighten them after finding.